Tìm hiểu nguyên nhân hạn chế công suất và giải pháp khắc phục cho trạm thủy điện A VƯƠNG 3

  • Nguyễn Văn Nghĩa

Abstract

A Vuong 3 hydropower construction is a daily regulary hydropower that has low head using Kaplan turbine. This construction was operated from August 2016, but this hydropower did not achieve the capacity by design although the upstream reservoir was full. This paper studied the causes of limited capacity and proposes a method to resolve, dredging the bed downstream chanal is a solution to improve the effective energy of this hydropower.

Keywords: Hydropower construction, Hydropower plant, A Vuong 3, effective energy, power of dry season, daily regulation.