Electric Transmission Company 1: Close successful electrical compartment vertical capacitor 500 KV substations 500 in Ha Tinh

  • Huy Lê

Abstract

From May 6/2013, but the prognosis is difficult to convey important cross-domain power in 2014, the Vietnam Electricity Corporation has been allocated to the National Electricity Transmission urgently improve load 500kV transmission line North - South, the replacement of the system capacitor 1500A 1000A previously this type of solution is a reasonable situation.

điểm /   đánh giá
Published
2016-11-07
Section
11. DOANH NGHIỆP – DOANH NHÂN